Leave Your Message
HZSY Series Split-type Mobile Concrete Batching Plant

HZSY Series Split-type Mobile Concrete Batching Plant

The HZSY Series Split-type Mobile Concrete Batching Plant is a new product created on the basis of the original fixed concrete mixing plant, combined with our company's years of experience in producing concrete mixing plants and specific needs at home and abroad, It integrates material storage, dosing, conveying, mixing, unloading, and fully automatic control systems into one unit, with the characteristics of tight and reasonable structure, convenient transfer, and quick disassembly and assembly.It is the best and optimal model for mobile construction of public railways, bridges, ports, water and electricity projects.

    Product Parameters

    Parameter Unit Model
    HZS120Y HZS180Y
    Theoretical productivity m³/h 120 180
    Model of mixer / JS2000 JS3000
    Power of mixer kW 2×37 2×55
    Recycling period S 60 60
    Max size of aggregate mm ≤80 ≤80
    Capacity of powder silo t 4×100 4×150
    Batching capacity of the batching station L 3200 4800
    Conveyor capacity of belt conveyor t/h 700 1000
    Capacity of aggregate silo 4×15 4×20
    Material discharging height m 4.2 4.2
    Installed power kW 165 220
    Maximum capacity of screw conveyor t/h 80 80
    Aggregate weighing range/accuracy kg 2000±2% 3000±2%
    Cement weighing range/accuracy kg 1200±1% 1800±1%
    Coal powder dosing range/accuracy kg 800±1% 1000±1%
    Water dosing range/accuracy kg 500±1% 800±1%
    Additive dosing range/accuracy kg 50±1% 50±1%

    Product characteristics

    01

    The entire station is made of solid materials:The main frame and supporting legs are made of large-sized H-beams, which are sturdy and durable,with a service life of more than 10 years.

    02

    Convenient transfer:In addition to the filler tank and batching machine, the main building can be towed away with just one vehicle.All water, electricity, and gas pipelines have been installed,leaving quick connectors for external connection.

    03

    Integrated design.The main building, inclined belt conveyor, and other components are integrated and sealed in a containerized manner. Compact structure, beautiful and elegant.

    04

    Quick disassembly and assembly:Except for the filler tank, the first installation of the entire station only takes 2 days, and the transition installation only takes 1 day.

    description2

    Project Case

    Leave Your Message